NEXT-GOV — Continuity Contract
Purpose
Make tomorrow or next week restartable without reconstructing context.
Contract
A next pointer is valid when it names:
- the next action;
- the artifact or context;
- the first step;
- any warning or boundary.
Inputs
- Current block result
- Artifact link/path
- Open blocker
- Board annotation
- Carry State if project-level
Outputs
- Next pointer
- Restart note
- Parked reason
- Monday bridge
Tick valid when
A future block can restart without reconstructing the thread.
Stop rule
A next pointer is not a report. It should be short enough to use under low energy.